Supporting Reconstruction After Fire

In November 2019, a devastating fire swept through the Claremont Hotel on Eastbourne seafront. The Grade II listed landmark, built in the 1850s, experienced a partial collapse, rendering the structure unstable and in urgent need of support.

To enable scaffolding to be safely erected around the building’s remains, a reliable ballast solution was required to withstand the strong coastal winds sweeping along the promenade. Maidstone Scaffolding turned to us to provide a quick, practical precast option that would maintain the structure’s stability and keep the project on track.

Claremont Hotel Ballast Block installation

Project Overview

  • Client – Maidstone Scaffolding
  • Location – Eastbourne, East Sussex
  • Sector – Heritage / Construction
  • Services Provided – Supply & installation
  • Project – Claremont Hotel scaffolding support
  • Products Supplied – 1T Concrete Ballast Blocks
  • Installation Duration – 1 day (blocks in place within 2 hours)

Project Background

The partial collapse of the hotel posed serious safety risks and made the site highly complex to manage.

With the seafront location exposed to strong winds and severe weather, scaffolding alone was not enough — it required substantial counterweights to stay stable during the reconstruction.

The solution needed to be delivered quickly, positioned accurately on a restricted site, and robust enough to withstand both the weather and the stresses of the scaffolding system.

Our Solution

Why Precast Ballast Blocks

We supplied and delivered 36 of our 1T precast ballast blocks, designed for use as counterweights in temporary works and scaffolding projects. Using our vehicle-mounted Moffett with a block grab, the blocks were off-loaded directly into position in just two vehicle loads.

Key benefits for this project included:

  • Rapid installation – blocks delivered and placed in just two hours
  • Stability in exposed conditions – 1T weight per block resisted strong coastal winds
  • Accurate positioning – Moffett handling placed units exactly where required
  • Minimal disruption – compact delivery process suited the busy seafront location

The Results

Within a single morning, the scaffolding was fully secured with ballast in place, allowing Maidstone Scaffolding to continue works without delay. The quick response meant safety could be assured for workers, the public, and the surrounding structures, helping the rebuild of this iconic heritage hotel get underway.

Products Used In This Project

Designed for scaffolding ballast and counterweight applications, our 1T precast blocks are easy to transport and install, making them ideal for fast-paced or constrained sites.

  • Key features1T weight, forklift and Moffett handling, rapid delivery & install
  • Best for – Scaffolding ballast, counterweights, temporary stability

    Let’s Price Your Project

    No obligation | Fast 4h response | Trusted by contractors nationwide


    So we know who to contact.


    Helps us match your enquiry in our system.


    In case we need more details about your project.


    We’ll send your quote here.


    Just the town or postcode is fine.


    A short outline is fine.

    Scroll to Top